Guide for contractors and suppliers

Construction permit leads: how contractors find and work them

Updated · Rotomal

Construction permit leads are new building permits filed with a city or county, used as an early signal that a job is about to start. A permit record usually shows the property address, permit type and description, the filing or issue date, often a job valuation, and the contractor of record. You can pull them yourself from local permit portals for free, buy national permit data from vendors (Shovels lists $599–999 a month), or get a filtered weekly list for one trade and one metro, which is what Permit Weekly does from $49 a month.

What a construction permit lead contains

A permit is filed before most regulated work starts: new homes, additions, pools, re-roofs, solar, HVAC replacements, demolition. Because the filing is a public record, it tells you where work is happening weeks or months before the finished job is visible from the street.

The fields vary by jurisdiction, but a usable lead normally has:

  • Property address (and often the parcel number)
  • Permit number, type and a free-text work description
  • Status and dates: applied, issued, finaled
  • Declared valuation of the work, where the jurisdiction records it
  • Contractor of record, usually with a license number
  • A link back to the record in the city or county portal

Which permits signal which jobs

The same permit is a different lead depending on your trade. A re-roof is competitor intelligence for a roofer and a prospect for a gutter installer. Useful pairings:

Permit typeLead forWhy it matters
New single-family homeLandscapers, pool builders, fencing, gutters, security and AV, cleaningFinishing trades are hired in the months after framing; the owner has a budget and a move-in date
Pool or spaPool service, fencing, landscaping, electriciansEvery new pool needs ongoing service, safety fencing and often a new circuit
Re-roofRoofers, gutter installers, solar installersShows which neighborhoods are replacing roofs now and which competitors are winning them
Solar PVElectricians, roofers, battery installersSolar jobs often trigger a panel upgrade and sit on roofs that may need work first
HVAC replacementHVAC contractors, insulation, duct cleaningCompetitor activity by ZIP code, and homes investing in comfort
Addition or remodelFlooring, cabinets, windows, painters, dumpster rentalInterior trades follow the structural permit
DemolitionExcavation, dumpster rental, general contractorsA demolition usually precedes a new build on the same lot

Where permit data comes from

Permits are issued by thousands of separate cities and counties, each with its own system. Large cities often publish permits on open-data portals with an API, which is why most national datasets lean on them. Suburbs and smaller counties usually run a permit portal with a search form and no feed, so their permits are only available to someone who visits the portal regularly.

Portals also lag. A permit can appear anywhere from a day to a few weeks after it is filed or issued, so the date the jurisdiction posted it matters as much as the permit date itself.

Three ways to get permit leads, and what each costs

OptionCostFits
Check the portals yourselfFree, plus a few hours a week per metroOne or two jurisdictions and a disciplined Monday routine
National permit-data vendorsShovels lists $599–999 a month; Construction Monitor sells by market and categorySales teams covering several states that need analytics
A weekly list for one trade and metro (Permit Weekly)$49–199 a monthOwner-operators and suppliers who want a short list they can work every week

How to work a permit list

  • Act within days. The first contractor to reach a homeowner with a relevant offer has the advantage; permit leads are not exclusive.
  • Mail or door-knock around clusters. Several permits on one street are a better route than one permit across town.
  • Call the contractor of record about subcontract or supply work. A general contractor with ten permits this month needs trades.
  • Rank contractors by volume if you sell to them. Permit counts by contractor over 90 days show who is busy and who is new.
  • Track every lead as contacted, quoted or won, so next week's list only shows what is new.

If you contact homeowners, follow Do-Not-Call, TCPA, CAN-SPAM and local solicitation rules. Permit records do not include phone numbers or emails, and buying appended contact data brings its own compliance questions.

Common mistakes

  • Buying statewide data when you serve a handful of ZIP codes.
  • Treating the declared valuation as the job price; it is often an estimate for fee purposes.
  • Ignoring status. An applied permit may never be issued; an issued one means work is imminent.
  • Counting the same job twice when a city and county both list it.
  • Letting the routine lapse in busy months, which is exactly when competitors keep pulling permits.

Questions

Are building permits public record?

In the US, building permits are generally public records, but each jurisdiction decides how they are published. Some offer open data, some only a search portal, and some portal terms restrict automated access, which we respect.

Are construction permit leads and building permit leads the same thing?

Yes. Both terms describe new permits used as sales leads. 'Construction permit' is more common for new builds and commercial work; 'building permit' is the formal name in most codes.

How current are permit leads?

As current as the portal. Most jurisdictions post within a day to a few weeks of filing or issuance. A weekly list compiled from daily reads is usually within days of the portal.

Do permit leads include homeowner phone numbers?

No. Permits normally show the property address and the contractor of record. Permit Weekly does not append homeowner phone numbers or emails.

Sources